After several failed attempts at mooring at the visitor moorings (in urgent need of dredging), we had no option but to go through the tunnel. Salterforth |
The green light is only on, on the hour from this end of the tunnel for 10 minutes to allow plenty of time for passage from the other direction. However, we couldn't set off through the tunnel even though it was showing green as we could hear (bouncing off the sides) and see the light of a hire boat who quite clearly had jumped the red light at the other end of the tunnel!!! We were one of three boats waiting and we all only just made it through before it turned to red at our end. Safely through the tunnel, we moored up at the visitor moorings at the top of Barrowford Locks.
Foulridge Tunnel |
No comments:
Post a Comment